Subscribe to Our Newsletter

Success! Now Check Your Email

To complete Subscribe, click the confirmation link in your inbox. If it doesn’t arrive within 3 minutes, check your spam folder.

Ok, Thanks

electric cooperatives

A collection of 19 Posts

The Panels Are Bolted Down and Paid Off. The Meter That Pays Them Back Clears Whenever the Co-op Gets To It. post image

The Panels Are Bolted Down and Paid Off. The Meter That Pays Them Back Clears Whenever the Co-op Gets To It.

The Panels Are Paid Off and Bolted Down. The Co-op Still Hasn't Signed the Line. post image

The Panels Are Paid Off and Bolted Down. The Co-op Still Hasn't Signed the Line.

The Study Fee Costs More Than the Panels. The Genset Keeps Burning Diesel While You Wait. post image

The Study Fee Costs More Than the Panels. The Genset Keeps Burning Diesel While You Wait.

The Auction Awards a Megawatt. The Line to Carry It Was Never Built. post image

The Auction Awards a Megawatt. The Line to Carry It Was Never Built.

The Award Letter Prints in Megawatts. The Bank Reads a Line That Can't Deliver. post image

The Award Letter Prints in Megawatts. The Bank Reads a Line That Can't Deliver.

The Meter Runs Backward for a Day. The Cap Zeroes the Credit by Noon. post image

The Meter Runs Backward for a Day. The Cap Zeroes the Credit by Noon.

The Auction Awards the Megawatts. The Wire to Carry Them Waits for Years. post image

The Auction Awards the Megawatts. The Wire to Carry Them Waits for Years.

The Rules Say 10 Working Days. Cebu's Meter Still Waits on the Co-op. post image

The Rules Say 10 Working Days. Cebu's Meter Still Waits on the Co-op.

The Loan Recomputes Monthly. The Charger Past Talisay Was Never Wired. post image

The Loan Recomputes Monthly. The Charger Past Talisay Was Never Wired.

The Auction Never Sent a Boat. The Diesel Barge Skipped Sulu Anyway. post image

The Auction Never Sent a Boat. The Diesel Barge Skipped Sulu Anyway.

Cebu Drivers Bought the E-Trikes. The Charging Ports Past the City Line Have No Power Running to Them post image

Cebu Drivers Bought the E-Trikes. The Charging Ports Past the City Line Have No Power Running to Them

The Auction Rewards a Bond a Barangay Cannot Post post image

The Auction Rewards a Bond a Barangay Cannot Post